Gas-handling Equipment:
Gas Quality provides a complete line of gas-handling equipments as
|
![]() |
![]() |
Gas-control Equipments:
Gas Quality offers gas-control equipments as
|
![]() |
![]() |
Gas handling with safety equipment
Automatic and manual decompression groups and panels
- Flow control instruments
- Pre-heaters
- Measuring and alarm systems
- Distribution lines and cylinder lockers
- Leak detection systems
Automatic change distribution and decompression panels
Automatic change distribution and decompression panels allow an uninterrupted flow of gas to be obtained from two cylinders or from two manifolds with several cylinders by automatically changing from an empty cylinder to its stand-by without operator intervention.
Manual change distribution and decompression panels
Manual change distribution and decompression panels are the first stage of pressure reduction in a centralized distribution system. Modular extension cylinder manifolds can easily be connected to the panel to allow for the simultaneous use of several cylinders.
Modular extension cylinder manifolds
these manifolds allow groups to be readily connected to panels and between one another to increase in-line cylinder availability.
Pressure reducers for cylinders
Single stage membrane pressure reducers
Simple expansion reducers with stainless steel membrane. Compatible with the gases being used Suitable for applications where increases in pressure caused by the emptying of the cylinder.
Two stage membrane pressure reducers’
Double expansion reducers with stainless steel membrane. Two stage pressure reductions assure accurate regulation.
Single stage pressure reducers with metallic bellows
Simple expansion reducer. Particularly suitable for applications requiring a small flow and where pressure increases.
Two stage pressure reducers with metallic bellows
The two stages of pressure reduction assure accurate regulation.